EV @ AMELIA APARTMENT
LOCATION: Miami, Florida
TYPE: Commercial
TEAM: CJ Development Group LLC
SOW: EV CHARGERS DESIGN, PROCUREMENT & INSTALLATION
2ea Dual Pedestal Mounted Level 2 Chargers


2ea Level 2 - 48A Chargers
BESS @ LAKELAND, FL
LOCATION: Lakeland, Florida
TYPE: Residential
TEAM: CJ Development Group LLC
SOW: FranklinWH BATTERY STORAGE SYSTEM

SOLAR @ HOLLYWOOD, FL

LOCATION: Hollywood, Florida
TYPE: Residential
TEAM: CJ Development Group LLC
SOW: ENPHASE SOLAR SYSTEM

EV @ TRINITY CLUB APARTMENTS
LOCATION: Trinity, Florida
TYPE: Commercial
TEAM: CJ Development Group LLC
SOW: EV CHARGERS DESIGN, PROCUREMENT & INSTALLATION
2ea Dual Pedestal & 1ea Single Pedestal Mounted


5ea Level 2 - 64A Chargers
EV @ 900 BISCAYNE BLVD.
LOCATION: Miami, Florida
TYPE: Commercial
TEAM: CJ Development Group LLC
SOW: EV CHARGERS DESIGN, PROCUREMENT & INSTALLATION
The image shows a recently installed EV charger setup mounted on the exterior wall of the parking garage. The charger units are sleek and modern, with a digital display screen. The charging cable is neatly coiled on a holder attached next to the charger. The power conduit runs from the charger unit into the wall, indicating a professional and tidy installation.

4ea Level 2 - 64A Chargers
THE VILLAGES SOLAR
LOCATION: The Villages, Florida
TYPE: Solar Ground Mounted System Design
TEAM: Orange Blossom Utilities Inc. & CJ Development Group
SYSTEM SIZE: 62.00 kW DC
The empty vacant land will accommodate around 200ea solar panels in a ground-mounted system arrangement. The energy produced will be retrofitted back to the utility grid. The client trusted our engineering firm expertise for best use of layout and placement to maximize energy produtction.
200ea PHONO SOLAR PANELS
62.00 kW DC / 60.00 kW AC